documentation

WAES project procedures require full adherence to project specific SDRL or VDRL.  All client and sub vendor meetings are fully documented by Minutes of Meetings and WAES Project Managers ensure full and timely compliance with all deviations

As part of any project WAES ensures full documentation is provided on schedule to the project program.  WAES has a full range of standard documentation inclusive of:-

 

· Comprehensive Project Program

· Construction Schedule

· HVAC Design Calculations

· Single Line Drawings

· Project Specific P+ID’s and D+ID’s

· Full Electrical Design Drawings

· Equipment GA’s and Data Sheets

· Cause and Effect Matrix

· Product Literature

· Operation Manuals

· Maintenance Directories